Shadow mode first. Nothing touches production.

A pilot that controls a production decision on day one is not a pilot, it is an unmanaged change. EcoKure runs alongside your workflow, produces evidence packs, and controls nothing until you have seen what it would have done.

Method

Six steps, and the fifth one is the point

01
Scope one workflow. Named, with its start and end points, and the systems that are explicitly out of scope written down.
02
Map the dependencies. Source evidence, governing controls, decisions, approvals and reviewers, agreed with you rather than assumed by us.
03
Measure the baseline. What the current process costs in time and review effort, taken before we touch anything.
04
Run in shadow. EcoKure observes and produces evidence packs. It controls no production decision.
05
Compare against pre-agreed criteria. Set before the pilot begins, including what would count as failure. This is what separates a pilot from a demonstration.
06
Decide. Proceed, extend, revise or stop, with the criteria for each fixed in advance so the decision is not argued afterwards.

A pilot report without failures in it is not a pilot report

Every report we produce includes what did not work, the cases the system declined to decide, and the assumptions that turned out to be wrong. It is written to be read by a board or a risk committee, which means it has to survive someone looking for the weak part.

Measurement

What gets measured, and why each one matters

MetricWhat it tells you
False-pass rateWhether the system can be trusted at all. Everything else is secondary to this.
False-block rateWhether production will tolerate it. A safe system nobody can work with is not deployed.
Abstention rateWhether determinism is being bought at the cost of usefulness.
Affected versus preserved accuracyOver-flagging destroys the economics as surely as under-flagging destroys the safety case.
Replay reductionThe commercial argument, in your numbers rather than ours.
Review workloadWhether the human cost of the exceptions is affordable in practice.
Deterministic replay consistencyWhether a third party can reproduce a result. If not, nothing else is verifiable.
Tamper-detection rateWhether the evidence is worth signing.
Time to evidence releaseWhether the workflow gets faster or slower overall.
Integration timeWhether delivery can be repeated, or whether every deployment is bespoke.
The template

Twenty-five fields, agreed before anything starts

A field left blank is a field that gets argued about later. We complete this with you, and you keep it whether or not the pilot proceeds.

#FieldWhat good looks like
1Customer problemOne sentence, in your language, describing what currently goes wrong and what it costs.
2Workflow boundaryThe specific workflow, named, with its start and end points.
3In-scope systemsNamed systems, with owners.
4Out-of-scope systemsNamed explicitly. This field prevents more disputes than any other.
5Source evidenceWhat the workflow relies on, where it comes from, how it is versioned.
6Governing controlsThe obligations, policies and internal controls that apply, with references.
7Dependency modelHow evidence, decisions and approvals depend on each other, agreed with you.
8Required lanesWhich lanes run, in what order, and what each can and cannot decide.
9Reviewer rolesWho is authorised to review what, and their expected time commitment.
10Deployment modelCloud, on your infrastructure or hybrid, with the data-residency position.
11Security requirementsTenancy, key management, access control, logging and retention.
12Benchmark methodologyHow the result will be measured, written down before the pilot starts.
13BaselineThe current-state measurement, taken before EcoKure touches the workflow.
14Success criteriaSpecific, measurable, pre-agreed and signed by you.
15Failure criteriaWhat would constitute a failed pilot, stated as plainly as success.
16Abstention handlingWhat happens operationally when the system declines to decide.
17Evidence-pack contentsExactly what a pack contains, and how a third party checks it.
18Implementation timelineWeeks, with dependencies and who is blocking whom.
19Your responsibilitiesData access, subject-matter expert time, review capacity, environments.
20Our responsibilitiesIntegration, configuration, reporting and support during the pilot.
21Legal and IPNDA, pilot agreement, ownership of configurations, publicity rights.
22Data handlingProcessing terms, residency, retention, deletion, sub-processors.
23ReportingCadence during the pilot, and the final board-ready report format.
24Decision at completionProceed, extend, revise or stop, with the criteria for each set in advance.
25Pathway to productionWhat changes between pilot and production, including who owns the risk.
Honesty

What we tell you before you commit anything

  • EcoKure is early stage and pre-revenue. No customer has yet taken a pilot through to a production licence.
  • Implementation effort per customer is not yet a known quantity. We measure it during the pilot rather than quoting a number we cannot support.
  • Pricing is a hypothesis. No customer has paid it, and we will say so rather than imply a market rate exists.
  • We hold no certifications. Controls are built to be auditable, which is a different claim.
  • If the pilot fails its own criteria, the report says so and we do not ask you to reinterpret it.

Scope one workflow

The first conversation is thirty minutes and produces the first four fields of the template. If it does not, that is a useful answer too.